Konongo By-pass (Accra–Kumasi Highway)
Ongoing61% complete
About this project
Construction of dual carriageways bypassing Konongo on the Accra–Kumasi Highway. The south-bound carriageway (13.60km) was 60% complete and the north-bound carriageway (13.60km) was 61% complete, as of the 2025 Budget Statement (status as of December 2024).
